1.    DOCUMENTS NEEDED TO BE SUPPLIED

TT

Content

SL requested

Form

Note

1

Investment certificate/business license

1

Photo or notarization

2

Certificate of land use rights / Land lease contract / Minutes of location agreement.

1

Photo

3

Relevant legal documents (documents from the Department of Natural Resources and Environment, People’s Committee, Department of Natural Resources and Environment…)

1

Photo

4

Investment report (Project content)

1

Photo

5

Blueprint

a

The overall plan shows the location of production areas, existing waste warehouses, and environmental protection works.

Current layout drawing of production areas after capacity increase

1

Autocad/photo

b

Diagram of water supply system

1

Autocad/photo

c

Diagram of rainwater collection and drainage system

1

Autocad/photo

d

Diagram of water supply, rainwater and wastewater drainage systems

As-built drawing

1

Autocad/photo

6

Contract for collecting household waste, hazardous waste, industrial waste, and latest hazardous waste treatment documents

1

Photo or scan

7

Periodic environmental monitoring report for 2018 and 2019

1

Photo or scan

8

Contract for wastewater and rainwater connection to the industrial park, drawing showing connection location

1

Photo or scan

9

Decision to approve fire protection, existing fire protection equipment and installation locations

1

Photo or scan

10

As-built drawings, construction permits

1

Photo or scan

11

Drawings and technical documents of wastewater and exhaust gas treatment systems

1

Photo or scan

12

Decision approving commitment to environmental protection

1

Photo or scan

13

Electricity bill, water bill (latest 3 months)

1

Photo or scan

14

Photos of existing environmental protection works (exhaust gas, wastewater, garbage, manholes connecting rainwater and wastewater to the industrial park)

15

Register of hazardous waste source owners (if any)

16

The company’s location adjacent to other projects (front, back, left, right side adjacent to how many companies within a radius of 1km, corresponding manufacturing industry of each company adjacent to project)

 

2.    INFORMATION ABOUT THE PROJECT

Balance table of existing area and after capacity increase

2.3. Products, capacity

Existing products (tons/year), what types of products will be available after capacity increase (tons/year)?

2.4. Demand for raw materials, fuel, and chemicals

Existing raw material needs and when increasing capacity

STT

Type of fuel

Unit

State of existence

Existing mass

When increasing capacity

total

1

 

 

 

 

 

 

2.5. List of machinery, equipment

List of existing machinery and equipment:

TT

Device name

Operating capacity

Year of manufacture

Status

Manufacturing country

Uses of machines

1

List of machinery and equipment when increasing capacity:

TT

Device name

Operating capacity

Year of manufacture

Status

Manufacturing country

Uses of machines

Note: Provide adequate quantities of machinery and equipment before and after capacity increase

2.6. Labor, electricity and water needs

[Instructions: Please check the investment report: If it is recorded in the investment report, this item is not needed]

a)    Labor needs

Exist: ? workers, number of shifts: ? day shift

After increasing capacity: ? workers, number of shifts: ?shift/day

Does the company cook for workers or does it use industrial catering?

Đánh giá

Average rating 0 / 5. Vote count: 0

Bạn hãy đánh giá cho bài viết này